|
|
Program |
|
|
1.Beginning
>>Response to the global operational development of enterprises
Thanks to the open markets of cosmopolitan trade activities that enterprises can now take the world as one single market considering less about national borders, purchasing and manufacturing in various countries, and then selling products worldwide. The moment Taiwan stepped into the World Trade Organization (WTO), the less possibility for Taiwan to stay out of the global trends. The program Global Operational Development Plan, based on liberalization and internationalization managerial mode, was passed by the Government in October, 2000.
>>Strengthen the advantages in competitive power in Taiwan
The Government announced Port Free Trade Zone Establishment Act of Administration in July, 2003, in the hope of reinforcing the advantages in competitive power in Taiwan, building a track which connects Taiwan to the world by integrating Physical distribution, commercial interchange, information class and golden class.
>>The Goal
Commercial opportunities: to invest in fundamental constructions of global operation that will make Taiwan a perfect land for businessmen and transnational corporations to set up operational district headquarters |
2.Taichung Port Free Trade Zone Area
Taichung Port Free Trade Zone exploitative area amounts to 536ha, divided into two phases and three exploitative areas.
The First Phase
District 1: Wharf #1-18 with 181ha.wharfage
The formal operation started on October 31, 2005.
District 3: West wharf #1-7 with 77ha.wharfage
The formal operation started on October 31, 2005.
The Second Phase
District Two: Wharf20A-46 with 278ha.wharfage.
The formal operation day will be in July 2006 |
 |
3.Software and hardware construction in Taichung Port Free Trade Zone :
Software and hardware facilities hereunder for free commercial harbor area dealing with relevant business through computer connection and electronic material transmission mode are in the process being constructed. The construction is expected to be completed in 2007.
>>Free Port Area automation gate sentry post control system:
North dike, North pier, the fourteenth intersection, the tenth intersection, central pier, south basin and west wharf are equipped with automatic gate sentry post control system, positions chosen according to the Three Districts. Cargo control at Free Harbor Area is computerized. The system registers cargo port entry and exit information, and then has information circulation with custom dynamic data base and harbor district affairs.
The functions includes Human and vehicle turnover gate sentry post automation identification, Human and vehicle material immediate checkup, Cabinet (thing) entry and exit gate sentry post immediate material checkup and record, and Car lane surveillance video taping, Net transporting, Gate information display, Data statistic report and Unusual information processing mechanism.
>>Free Port Area CCTV supervisory system:
Coordination of automation gate sentry post control, and the entity fence and the CCTV monitoring device setting up. The total distance is approximately 7,340 meters. The system clearly distinguishes the controlled area and the non-controlled area of the free port district and conforms to the international ships and the port facilities preserve stipulation.
>>Construction of the information platform
The regulatory body of the Free Harbor Area will integrate the electron data for human, vehicle, and Cabinet entry and exit control demanded by port area correlation units. In different work and application flow, the goal of building the sole platform and window can be reached by planning the feasible system conformity plan. The platform carries on the data, the Harbor Police Bureau Person Vehicle Passes Management, Free Harbor Area Enterprise, Port Area Gate Sentry Post, Customs Pass through Information and Trade Network Cabinet, exchange and transmission, and controls circulation of all information. Take the interface as a bridge for the electronic data transmission system to reach the demand for person and vehicle control.
>> Different system:
To coordinate Free Port Trade Zone, Ministry of Transportation and Communications, of goods situation. To track the feasibility for the platform of the information sharing and to arrange research plans
|
4.Rentable Land
There is land of total 170.17 ha. rentable.
District One: 41.33ha. rentable land
Position & Area
| Position |
Area(ha) |
Position |
Area(ha) |
| #2 Wharf |
3.20 |
#12 Wharf |
1.91 |
| #4B Wharf |
1.51 |
#13 Wharf |
1.74 |
| #4C Wharf |
7.90 |
#14、15 Wharf |
3.10 |
| #5B Wharf |
5.18 |
Central Second Rd. and North first Rd. triangular land |
11.97 |
| #5A Wharf |
3.10 |
|
|
| #5 Wharf |
0.86 |
|
|
| #6 Wharf |
0.86 |
|
|
| |
|
Total |
41.33 |
District Two: 118.57ha. rentable land
Position & Area
| Position |
Area(ha) |
Position |
Area(ha) |
| #20A Wharf |
0.98 |
#36 Wharf |
14.85 |
| #20 Wharf |
2.01 |
#37 Wharf |
14.85 |
| #23 Wharf |
0.73 |
#38 Wharf |
14.85 |
| #25 Wharf |
1.22 |
#39 Wharf |
16.11 |
| #26 Wharf |
0.56 |
#40 Wharf |
10.78 |
| #29 Wharf |
0.74 |
#41 Wharf |
14.85 |
| #30 Wharf |
3.39 |
#42、43 Wharf |
4.69 |
| #31 Wharf |
15.5 |
#46 Wharf |
2.46 |
| |
|
Total |
118.57 |
District Three: 10.27ha. rentable land
Position & Area
| Position |
Area(ha) |
| #W6 Wharf |
10.27 |
| Total |
10.27 |
|
5.Industries being able to station in:
>>Free Port Area Enterprises:
Trade, warehousing, physical distribution, cabinet (thing) collection and distribution, the entrepot, the transportation, contract ship, the declaration service, the assembly, rally, the packing, repairing, the processing, the manufacturing, the display or the technical service.
Financial, loading and unloading, dining, hotel, commercial conference, transportation and other authorized businesses |
6.The operation situation of manufacturers stationed in:
District
| District |
Place for operating |
Free Harbor Area Enterprises |
Details in operation |
| District One |
1、3 Wharf Granary |
FAR EASTERN SILO & SHIPPING CORPORATION RENT |
Cereal warehousing, physical distribution, entrapot |
#16,17 Wharf Granary |
BLITE INTERNATIONAL MARKETING & MANGEMENT CO. LTD. RENT |
Automobile warehousing, related physical distribution |
#11 Wharf Granary |
CHINA CONTAINER TERMIAL CORPORATION |
Cabinet warehousing, collection and distribution service, and consults with the strategy partner to enter and station in |
| District Three |
West 5 Wharf
Gasoline Tank |
YIJHOU COASTAL CORPORATION |
Import bunker oil from central Asia. Export Northeast Asia and the mainland after materials mixing. International airway freighter refuels. The whole year volume of goods handled is estimatied1,500,000 tons at the beginning of the phase with an output value of approximately new Taiwan dollar 30,000,000,000 Yuan |
|
|
|