Return to EN_index
::: HOME[AccessKey Alt+B] SiteMap Chinese Children
 
     search
    
 
:::
Welcome
Recent News
Introduction
Daily Status
Service
Port Facilities
Useful Links
Site Map
Statistical Abstract Download(Creat New Window)
Port Facility Security Website
Taichung Port Free Trade Zone
ISO1
ISO2
ISO27001 verify TW07/0031ISMS
::: Service >> Ship Repairing Works >> Enter and Berth Dock Charges
Ship Repairing Works
Enter and Berth Dock Charges

   Enter and Berth Dock Charges
 
 
Foreword:
This ship & machinery repair works was set up in March 1976, and started its initial operations from July of that year. In the early running, the shipyard has offered limited service to the neighbored merchant ships besides its endeavor to constant maintenance and repairs for the harbor vessels. Continued plant constructions and equipments during the subsequent years have promoted the productivity to a larger scale until the extension of the dry dock completed in June 1984, leading the shipyard to commence its full service business.

 
Scope of Business and Capability:
Docking Repair–Annual repair, periodical overhaul and routine servicing in dock for ships under 15,000G.T


Main Facilities:
Dry Dock:L–155m, B–28m, D–8m., equipped with:
A、 6T. Capstan×4, underground pump room×2(each with 100KW main pump×2,
        50HP auxiliary pump×3 and ventilation system), 100HP air compressor×1,
        1,000KW Emergency diesel dynamo×1, power supply box×10(A/C 60Hz
        440V 380V 220V 110V), and pipes of compressed air, fresh water and sea
        water.
B、 1. Iron Work Shop, equipped with:
           20T. Overhead Traversing hoist×1. Hydraulic Press(400T)×1. 50HP. Plate
            roller×1, 30HP plate shear×1,etc.
       2. Associated Machine Shop, equipped with:
           5T. Overhead Traversing hoist×1, engine lathes×5 (5m×1, 2.5m×1, 0.85m×2,
           8m×1). Hydraulic Press(100T)×2. and other equipments for bench work &
           electric job, etc.


Enter and Berth Dock Charges:
 
Gross tonnage (Under 1,000 tons)
Enter dock (2 days):NT$ 85,000
Berth dock(Per day):NT$ 10,000
Gross tonnage (1,001~3000 tons)
Enter dock (2 days):NT$ 120,000
Berth dock(Per day):NT$ 12,000
Gross tonnage (Over 3,001 tons)
Enter dock (2 days):NT$120,000 + NT$16.00/T × (G/T–3,000T)
Berth dock(Per day):NT$12,000 + NT$2.00/T × (G/T–3,000T)
 

 

Note:

  1. Entrance and exit from the dock is charged in 48 hours increments. If 48 hours is not reached, then 48 hours will be charged.
  2. Berth dock is charged on a daily basis. If the time is less then one, a full day will be charged.
  3. After the vessel has entered the dock, any vessel movement or adjustment shall be charged as mach as 80% of entrance and exit charge.
  4. If vessels enter or leave the dock for inspection only, the dock entrance charge is doubled And limited in dock within 7 days, Self-repair work is the same charges.
  5. The above charges do not include Insurance, by the self-insurance side.
  6. The cost of non-project management (10%) and business tax (5%).
  7. Implementation Date: August 1, 2010 onwards.

GO TOP

Last Checked:2010-07-29 Last Updated:2010-02-25 Views:7843
Maintenance Unit:Ship Machinery Repair Works
 
Taichung Harbor Bureau © 2007~2008
You are visitor number: 2164
Webmaster E-mail:wwwadm@mail.tchb.gov.tw
Address:No.2, Sec. 3, Zhongqi Rd., Wuqi Township, Taichung County 435, Taiwan (R.O.C.)
Tel:886-4-26562611, FAX:886-4-26565720
We recommend Netscape / I.E.5.5 or higher. 800*600 resolution.