::: Service >> Operational Bulletin Board >> Terminal Operation Charges >> Equipment Utilization
Terminal Operation Charges
Equipment Utilization

   Equipment Utilization
 

Equipment Utilization Charges:

(1) Tuggage and Lighterage

Tuggage and lighterage shall be assessed against the consignee.

A.Tuggage:
Most handing operations are conducted with tugs to haul lighters or rafts, commencing with the cargoes discharged onto lighters or rafts till the completion of lift of the cargoes from lighters or rafts or till the completion of tugging. The tuggage shall be calculated according to the tonnage of the cargoes. However, minimum charge shall be 1/4 of the dead weight tonnage of the lighters hauled if the cargo tonnage is less than that. In the case of any particular tugging, the tuggage shall be charged according to the dead weight tonnage of the lighter or rafts hauled.

B. Lighterage:
(1) While a lighter is hired for cargoes, commencing with the day of discharging cargoes onto lighters till the completion of lift of the cargoes, the lighterage shall be charged according to both the tonnage of cargoes and the number of days stored on the lighter. However, minimum charge shall be 1/2 of the dead weight tonnage of the lighter or lighters if the cargoes loaded thereon are less than that. In the event that a lighter is hired but cancelled after being dispatched, the lighterage shall be 1/2 of the dead weight tonnage of the lighter hired.

(2) The lighterage for a particular hire of lighters shall be charged according to the dead weight tonnage of the lighter or lighters hired or the tonnage of the cargoes loaded whichever is greater. In the event that a lighter is hired but cancelled after being dispatched, the lighterage shall be 1/3 of the dead weight tonnage of the lighter hired.

Item & Unit & Rates
Item

Unit

Rates (NT$)

Tuggage

Per Ton Per Time

15.60

Lighterage

Per Ton Per Day

15.60

Remarks:The rates shown above are applicable to the operation inside the harbor area only. Rates for the operation outside the harbor area are subjected to separate negotiation.

(2) Charges for Utilization of Ground Scales:

Item & Unit & Rates
Item

Unit

Rates (NT$)?

Charges By Ton

Per Ton Per Time

2.90

Charges By Car

Per Car Per Day

48.90

Remarks: Charges by car is applied only to weight of empty car.

(3) Charges for Equipment for Night Operation:

Ship Classification & Rates
Ship Classification

Rates (NT$)

17:00~24:00

0:00~7:00

Ships less than 1,000G/T

489

489

Ships of 1,000G/T or more but less
than 10,000 G/T

977

977

Ships of 10,000G/T or more but less
than 20,000 G/T

1,955

1,955

Ships of 20,000 G/T or more

2,932

2,932

Remarks: 1. 50% discount for domestic liners below 500G/T.
2.The rates shall be charged only when the equipment is used.

(4) Hire for Machinery & Equipment:
Particular Hire:
In addition to basic cargo handling charges, hire charges shall be assessed for usage of machinery and equipment in the operation of stevedoring, shipside loading or discharge, particular handing and cargo shifting. Machinery & car boat hire shall be charged to the consignee.
Such hire shall be counted by the minimum charging unit of 1/2 hour Any time fraction less than 1/2 hour is counted as one unit.

When operating within the port area, starting time commences with the arrival of machinery/ car boat at the working lot and ends with the completion of usage. When operating outside the port area, the starting time is from the departure of the machinery/ car boat out of its dispatch area till the completion of usage. Any stand-by delay due to factors of the consignor shall be calculated as charging time for usage irregardless whether it is inside or outside of port area.

Any equipment with the capacity rated between two classes shall be charged based on the rate of the higher class.
For any machinery or car boat hire cancelled with the machinery or vehicle/ vessel sent back after its arrival at the operation lot, there’ll be a charge by the mimum charging unit of 1/2 hour even if the machinery or car or boat is not used. The beginning and the end of the charging time is the same as stipulated above.
There is a 20% discount on handling charges for transshipment cargo.

A.Fork Lift Trucks

Classification & Unit & Rates

Classification

Unit

Rates(NT$)

With lifting capacity of 1 ton or less

Per Hour

371

With 2-ton lifting capacity

Per Hour

469

With 3-ton lifting capacity

Per Hour

577

With 4-ton lifting capacity

Per Hour

694

With 5-ton lifting capacity

Per Hour

880

With 7.5-ton lifting capacity

Per Hour

1,025

With 10-ton lifting capacity

Per Hour

1,270

With 15-ton lifting capacity

Per Hour

1,661

With 20-ton lifting capacity

Per Hour

1,955

With 25-ton lifting capacity

Per Hour

2,248

With 35-ton or more lifting capacity

Per Hour

2,834

B.Mobile Crane or Log Carrier

Classification & Unit & Rates

Classification

Unit

Rates(NT$)

With lifting capacity of 5 tons or less

Per Hour

977

With 10-ton lifting capacity

Per Hour

1,368

With 15-ton lifting capacity

Per Hour

1,759

With 20-ton lifting capacity

Per Hour

2,150

With 25-ton lifting capacity

Per Hour

2,541

With 30-ton lifting capacity

Per Hour

2,932

With 40-ton lifting capacity

Per Hour

3,714

With 50-ton lifting capacity

Per Hour

4,300

With 75-ton lifting capacity

Per Hour

4,886

With 100-ton lifting capacity

Per Hour

5,375

With 150-ton lifting capacity

Per Hour

6,841

 

With 200-ton lifting capacity

Per Hour

8,795

With lifting capacity of 250 tons or more

Per Hour

10,750


C.Floating Crane

Classification & Unit & Rates

Classification

Unit

Rates(NT$)

With lifting capacity less than 40 tons

Per Hour

5,864

With lifting capacity of 40 tons or more bu tless than 60 tons

Per Hour

16,125

With lifting capacity of 60 tons or more

Per Hour

19,545

D.Land Carriers

Classification & Unit & Rates

Classification

Unit

Rates(NT$)

Electric Mobile Transport

Per Hour

215

Mini-tractor

Per Hour

274

Truck

Per Hour

489

Large Tractor

Per Hour

1,173

E.Bulk Machinery

Classification & Unit & Rates

Classification

Unit

Rates(NT$)

Portable grain sucker

Per Hour

1,270

Car-loader

Per Hour

645

Shovel

Per Hour

586

Magnetic lift

Per Hour

567

Grab Bucket

With capacity below 3.5M3

Per Hour

147

With capacity 3.5M3
or more

Per Hour

195

Charges for using heavy machinery for handling cargo on shoreside
For turning in & out at storage area, the hire for using machinery for handling heavy cargo weighing more than 5 tons shall be charged as stipulated hereunder. Besides the basic longshoring charges, particular hire shall not be collected again for the time used.

Weight of Each Package & Rates

Weight of Each Package

Rates Per
Revenue Ton(NT$)

Weighing 5 tons or more but less than 10 tons

93

Weighing 10 tons or more but less than 25 tons

156

Weighing 25 tons or more but less than 50
tons

205

Weighing 50 tons or more but less than 75 tons

283

Weighing 75 tons or more but less than 100 tons

381

Weighing 100 tons or more

572

Remarks: 20% discount for handling transit goods.

 

 


GO TOP

Last Checked:2008-10-14 Last Updated:2008-10-14 Views:4121
Maintenance Unit:Business Division
 
Taichung Harbor Bureau © 2007~2008
You are visitor number: 2164
Webmaster E-mail:wwwadm@mail.tchb.gov.tw
Address:No.2, Sec. 3, Zhongqi Rd., Wuqi Township, Taichung County 435, Taiwan (R.O.C.)
Tel:886-4-26562611, FAX:886-4-26565720
We recommend Netscape / I.E.5.5 or higher. 800*600 resolution.